Setzen von Bewehrungsstahlmatten zur Befestigung des Flussufers
embankment
armouring steel
excavator
Our client Vinci Construction sets reinforcement steel mesh on the embankment of the river Garonne in Toulouse. 2 LUDWIG HOOKS with 2T WLL each are used for this operation. They can be released from safe distance - one at a time or both at once. Just take a look at the steepness of the dyke! The dangerous and phyiscally challening climbing up on the mesh for manual release is elminated.