Back to overview
Customer: Vinci Energies
Infrastruktur: Setzen von Elektrizitätsmasten am Straßenrand
Infrastructure
utility pole
Our customer Vinci Energies uses our LUDWIG 5.3T hook to install overhead network supports at the side of the road. Previously, the use of an elevating work platform was required to disengage the hook. Now, thanks to the LUDWIG HOOK, all it needs is a press of a button.
Product
LUDWIGHOOK
Industry
Truck loading
Load
Poles / posts
Attachment method
Choker hitch
Related use cases
LUDWIGHOOK
Setzen von Beton-Fertigwänden auf spezielle Transportanhänger
Concrete precast
walls elements
Loading
LUDWIGHOOK · ROBORIGGER
Roborigger im Einsatz bei der Kranmontage in Sindelfingen
Crane Assembly
Tower Crane
LUDWIGHOOK
Messebau: Aufstellen einer temporären Fassade.
exhibition
temporary facade
assembly